American Contractor Bid is organized using a Work Breakdown Structure with the following elements:

 

Cost Type:  Cost Types are categories that items listed in an American Contractor Bid are organized into.  There are five Cost Types:  Material, Labor, Subcontract, Equipment, or Other.

 

Activity, Area, Group, Assembly:  An item in an American Contractor Bid can be assigned to an Activity, Area, Group, or Assembly.

 